Manufacturing — Pune, Maharashtra
Leading Auto Components Manufacturer
Peak demand charges exceeding ₹45 lakhs annually with frequent grid outages affecting production lines.
₹38 lakhs/year
Annual Savings
32%
ROI
2 MWh / 1 MW
Capacity
The Challenge
Peak demand charges exceeding ₹45 lakhs annually with frequent grid outages affecting production lines.
Our Solution
Deployed 2 MWh lithium-ion BESS with intelligent peak shaving and DG replacement capability.
Results
- 42% reduction in peak demand charges
- Eliminated 80% of DG runtime
- Zero production downtime in 18 months
- Carbon reduction of 450 tonnes CO₂/year
“BatteryCircle's BESS transformed our energy economics. The ROI exceeded projections within the first year.”
Rajesh Kumar
Plant Head
Ready to Transform Your Energy Infrastructure?
Get a customized BESS solution designed for your facility. Free consultation and ROI analysis included.